38 MW run-of-river hydro
Cascade Hydro becomes auditable
Ninety years of paper records and no way to prove any of it. Measuring every release at the gate turned a century-old hydro plant into an asset a regulator, and a lender, could audit.
CLIENT
Cascade Hydro
LOCATION
British Columbia, Canada
CAPACITY
38 MW run-of-river hydro
DELIVERED
2025

RESULT 01
1931
Year the plant was commissioned. Its first signed production record was written in 2025.
RESULT 02
6 wks
To instrument every gate and turbine and reconcile the first full season.
RESULT 03
14 mo
Shaved from the plant's water-licence renewal, settled on ledger evidence.
The challenge
Cascade’s plant had run since 1931 on a water licence that required annual reporting of flows and generation. The reports were assembled from gate logbooks, a 1980s flow meter and a good deal of institutional memory — and the regulator had begun asking for evidence that none of those sources could provide.
A planned refurbishment needed financing, and lenders were unwilling to lend against a production history nobody could verify.
What we did
Zephyra fitted each spillway and intake gate with calibrated flow instrumentation and read each turbine at the generator terminals, with hardware sized to a 38 MW plant rather than a utility fleet. Every release and every megawatt-hour was signed at source and committed to the ledger, and the plant’s licence conditions were mapped onto it so compliance could be read directly.
The regulator and the lending syndicate were given the same read-only access.
The outcome
The water-licence renewal, which had been expected to take two years, was settled fourteen months early on the ledger record. The refurbishment financed against a production history that, for the first time in ninety years, could be checked by anyone with the link.

“
“We had ninety years of paper records and no way to prove any of it. Now every release is measured at the gate and signed before it reaches the regulator.”
Priya Raghunathan
Compliance Lead, Cascade Hydro