ZEPHYRA

0%

SOLUTION 03

Wind Portfolio

Onshore and offshore fleets: nacelle sensors and atmospheric data turn wind speed into audited megawatt-hours, turbine by turbine.

var(--variable-By_daIBiy)

AT A GLANCE 01

1,900

Turbines reporting nacelle-level output, onshore and offshore.

AT A GLANCE 02

31%

Average curtailment reduction once losses became attributable to a turbine and an hour.

AT A GLANCE 03

20 yr

Design life of the field hardware, matched to the asset it watches.

How it works

Built for the asset it watches

4.9

The measurement stack wasn’t just a dashboard — it was a scientifically grounded system built for our asset class.

Ingrid Halvorsen, COO, Norvind Energi

Ingrid Halvorsen

COO, Norvind Energi

What we measure

Wind is the asset class where estimates hurt most. A turbine’s output depends on wind speed, direction, air density and the availability of the machine itself, and a single disputed month can stall a refinancing. Zephyra reads each turbine at the nacelle — power, rotor speed, pitch, yaw — and pairs it with met-mast and satellite atmospheric data.

The result is a per-turbine, per-interval record of what the machine produced and what the wind would have allowed.

How it works

Field units are rated for two decades in the nacelle, from Arctic onshore sites to North Sea platforms. Readings are signed at source and committed to the ledger over a resilient link, so a lost backhaul never becomes a lost interval.

Availability, curtailment and wake losses are attributed automatically, giving operators a defensible answer for every megawatt-hour that did not reach the grid.

What you get

Audited output every lender accepts without a side letter. Curtailment you can see, attribute and negotiate. And a fleet-wide record that makes a 640 MW portfolio as legible as a single turbine.

Capabilities

What comes with it

01

Nacelle-level sensing

Power, rotor speed, pitch and yaw read at every turbine, rated for twenty years in the field.

02

Atmospheric pairing

Met-mast and satellite data alongside each reading, so lost production is attributable to wind or machine.

03

Curtailment attribution

Every megawatt-hour that did not reach the grid is assigned a cause, a turbine and an hour.

04

Offshore-ready links

Resilient backhaul with store-and-forward, so a dropped connection never becomes a missing interval.

Proof in the field

See it working

Aerial view of wind turbines among farmland beneath drifting clouds

640 MW onshore wind

Verified

Norvind cuts curtailment 31%

A 640 MW onshore fleet across northern Norway was losing output to curtailment nobody could attribute. Nacelle-level measurement made every lost megawatt-hour traceable to a turbine and an hour.

Asset

640 MW onshore wind

640 MW onshore wind

Delivered

2024

2024

Ingrid Halvorsen

Ingrid Halvorsen

COO, Norvind Energi

Aerial view of diagonal solar panel rows across green fields

1.2 GW utility solar

Verified

Helia Solar goes bankable

Helia's 1.2 GW solar portfolio needed performance evidence its lenders would accept without a third-party audit. String-level measurement, reconciled against irradiance, gave them a record that speaks for itself.

Asset

1.2 GW utility solar

1.2 GW utility solar

Delivered

2025

2025

Mateo Ferrán

Mateo Ferrán

Head of Asset Performance, Helia

High-voltage pylon and power lines silhouetted against a sunset

380 interconnection points

Verified

Meridian Grid verifies at scale

A regional grid operator with 380 interconnection points was reconciling energy flows quarterly, by hand. Metering every hand-over to a single ledger brought settlement close to live and ended the arguments.

Asset

380 interconnection points

380 interconnection points

Delivered

2024

2024

Priya Raman

Priya Raman

Director of Regulatory Affairs, Meridian Grid

Aerial view of wind turbines among farmland beneath drifting clouds

690 MW offshore wind

Verified

Nordsee Delta proves 2.1 TWh

Three lenders, one offshore wind farm and no agreed production figure. Nacelle-level evidence committed to a shared ledger let Nordsee Delta prove 2.1 TWh of output to all of them at once.

Asset

690 MW offshore wind

690 MW offshore wind

Delivered

2025

2025

Marit Boeckmann

Marit Boeckmann

Head of Asset Management, Nordsee Delta

Solar panels beside a white battery storage container under a cloudy sky

480 MWh battery storage

Verified

Aurora settles dispatch disputes

An offtaker and an operator disagreed about round-trip losses at a 480 MWh battery for eight months. Instrument-level dispatch data replayed from the ledger settled it in an afternoon.

Asset

480 MWh battery storage

480 MWh battery storage

Delivered

2024

2024

Tomas Ek

Tomas Ek

Director of Trading, Aurora Storage

Hydroelectric dam spanning a forested river valley

38 MW run-of-river hydro

Verified

Cascade Hydro becomes auditable

Ninety years of paper records and no way to prove any of it. Measuring every release at the gate turned a century-old hydro plant into an asset a regulator, and a lender, could audit.

Asset

38 MW run-of-river hydro

38 MW run-of-river hydro

Delivered

2025

2025

Priya Raghunathan

Priya Raghunathan

Compliance Lead, Cascade Hydro

Create a free website with Framer, the website builder loved by startups, designers and agencies.